Surveying the A1 at the Leverkusen bridge before opening

31/01/2024

Contact

Name

Christoph Effkemann

Techn. Ang.

Phone

work
+49 241 80-95285

Email

E-Mail

Surveys were carried out on the new section of the A1 highway, adjacent to the Leverkusen bridge, on 31.01.2024. The roadway was surveyed with an Airborn scanner using a heavy-duty drone.

 
*** Video: A1 ***
From the flight to the point cloud